Disclaimer: This calculator provides estimates for planning purposes only. Actual concrete requirements may vary based on site conditions, form accuracy, soil settlement, and local building codes. Always consult a licensed contractor or structural engineer for load-bearing footings. We are not responsible for material over- or under-ordering.
Related Tools
Concrete Footing Calculator

Related Tools

Concrete Footing Calculator: How to Calculate Concrete for Footings

A concrete footing calculator takes the guesswork out of one of construction's most critical steps — estimating how much concrete you need for your footings. Whether you're pouring round piers for a deck or rectangular spread footings for a foundation, getting the volume right prevents costly overorders and dangerous underorders. This free concrete yard estimator handles both footing shapes, applies a waste factor, and converts cubic feet to cubic yards and bag counts automatically.

Getting your footing concrete right matters more than almost any other part of a build. Footings transfer structural loads to the ground, and both undersized and over-poured footings can cause long-term problems. Use the calculator above before placing any order.

How the Formulas Work

The calculator uses two geometry formulas based on footing shape:

Round Pier:    V (cu ft) = π × r² × depth
                 where r = diameter (in) ÷ 24

Rectangular:  V (cu ft) = length (ft) × width (ft) × depth (ft)

Total Volume (yd³) = V (cu ft) × quantity ÷ 27
With Waste = Total yd³ × (1 + waste% ÷ 100)
Bags Needed = ⌈ V cu ft × (1 + waste%) ÷ bag yield ⌉

The conversion factor 27 converts cubic feet to cubic yards (1 yd³ = 27 cu ft). The ceiling function on bags ensures you always round up — you can't buy a fraction of a bag.

Round Pier (Sonotube) diameter (in) depth (ft) Rectangular Footing length (ft) width depth
Fig. 1 — Round pier (left) and rectangular footing (right) with labeled dimensions used in the calculator.

Understanding Waste Factor

Concrete waste happens even on the most carefully managed jobs. Overdig in the form, spillage during pouring, residual concrete in the mixer drum, and slight form bulge all consume more material than the theoretical volume. Most professionals add 10% waste for footings — some increase to 15% for very deep pours or rough-cut forms.

Never skip the waste factor when ordering ready-mix. Trucks cannot easily return with a second load if you run short, and leftover concrete in the drum is charged at the full yard rate. Order with waste; use what you need.

Bag Size Comparison 80 lb 0.60 cu ft/bag ~45 bags/yd³ Best for large pours 60 lb 0.45 cu ft/bag ~60 bags/yd³ Good balance 40 lb 0.30 cu ft/bag ~90 bags/yd³ Small repairs
Fig. 2 — Concrete bag sizes and yields. Larger bags reduce labor but require more lifting strength.

Ready-Mix vs Bags: Which Should You Choose?

For volumes under 1 cubic yard, bagged concrete is almost always cheaper and more practical. You avoid the ready-mix truck's minimum charge (typically 1 yd³), delivery fee, and fuel surcharge. Above 1 yard, ready-mix becomes competitive — and above 3–4 yards, it's usually significantly cheaper per cubic yard than buying bags.

Beyond cost, consider logistics: mixing 40+ bags by hand is exhausting and time-consuming. If the calculator shows more than 40 bags, strongly consider a ready-mix delivery even if cost is similar. The labor savings alone justify it on most projects.

Cost Comparison: Bags vs Ready-Mix $0 $300 $600 $900 $1,200 $150 0.5 yd³ $293 $150 1 yd³ $585 $300 2 yd³ $1,170 $600 4 yd³ 80lb Bags ($6.50/bag) Ready-Mix ($150/yd³, min 1 yd³) For illustration only — actual prices vary by region and supplier
Fig. 3 — Accurately scaled cost comparison based on $6.50/80lb bag and $150/yd³ ready-mix with 1 yd³ minimum. Prices are illustrative; verify with local suppliers.

Pier Size Reference Table

Use this quick-reference table for common Sonotube sizes at standard depths. Bag counts shown are without waste factor; add 10% for your actual order.

Pier Diameter Depth Vol / Pier (cu ft) Yards / Pier 80lb Bags / Pier*
6 in3 ft0.5890.0221
8 in3 ft1.0470.0392
10 in3 ft1.6360.0613
12 in4 ft3.1420.1166
14 in4 ft4.2760.1588
16 in4 ft5.5850.20710
18 in5 ft8.8360.32715
24 in5 ft15.7080.58227

* Bags = ⌈cu ft ÷ 0.60⌉ without waste. Add 10% to your final order.

Tips for Ordering Concrete

  • Always add waste: 10% is standard for footings; increase to 15% for rough or irregular forms.
  • Ready-mix minimum: Most suppliers charge for a minimum of 1 cubic yard. If your project is under that, bags save money.
  • Order time: Ready-mix trucks need 24–48 hours notice in most markets; popular times book out further.
  • Short load fee: Ordering less than a full drum (typically 8–10 yd³) often triggers a short-load surcharge of $50–$150.
  • Curing time: Footings need at least 24–48 hours at 50°F+ before loading. In cold weather, plan for blankets or heated enclosures.
  • Check local frost depth: Footing depth requirements vary by climate zone. In northern states, footings must extend below the frost line (often 36–48 inches).
  • Slump matters: Specify slump (workability) when ordering ready-mix. A 4-inch slump is typical for footings; don't let the driver add excess water.

Frequently Asked Questions

It depends on the footing dimensions. Calculate the volume in cubic feet (length × width × depth for rectangular, or π × r² × depth for round), then divide by 27 to get cubic yards. Always add a 10% waste factor. Use the calculator above for instant results based on your exact dimensions.
Use the formula: V = π × r² × depth, where r is the radius in feet (diameter in inches ÷ 24). For a 12-inch pier 4 feet deep: r = 0.5 ft, V = 3.14159 × 0.25 × 4 = 3.14 cu ft. Divide by 27 for cubic yards. The calculator automates this for multiple piers simultaneously.
One 80lb bag of concrete yields approximately 0.60 cubic feet. Since 1 cubic yard equals 27 cubic feet, you need about 45 bags of 80lb concrete per cubic yard (27 ÷ 0.60 = 45). For 60lb bags (0.45 cu ft yield), you need about 60 bags per yard. For 40lb bags (0.30 cu ft), about 90 bags per yard.
Industry standard for footing waste is 10%. This accounts for spillage, over-excavation of the form, concrete left in the mixer, and slight form bulge under wet concrete pressure. For deep piers (over 5 feet) or rough unformed excavations, increase waste to 15%. Never order exactly the calculated volume without adding waste.
For under 1 cubic yard, bagged concrete is usually more economical since ready-mix has a 1 yd³ minimum charge plus delivery fees. For 1–3 cubic yards, costs are often similar — consider labor. Above 3 cubic yards, ready-mix is almost always cheaper and far less labor-intensive. If the calculator shows more than 40 bags, ready-mix delivery is worth serious consideration.
Footing depth depends on your local frost depth, soil bearing capacity, and structural load. In northern US climates, minimum depth is typically 36–48 inches to clear the frost line. In southern states, 12–18 inches may suffice. Always check your local building code and soil report. Footings that are too shallow can heave in freeze-thaw cycles, causing structural damage.
Ready-mix concrete typically costs $130–$200 per cubic yard depending on your region, mix design, and current material prices. Short-load fees apply for orders under a full drum (usually $50–$150 extra). Bagged concrete costs roughly $6–$9 per 80lb bag, which works out to $270–$405 per yard in material cost alone — significantly more than ready-mix at higher volumes.